Long leaf earrings £36
These long leaf print earrings are made with sterling silver. To achieve the leaf texture a skeleton leaf is pressed into silver sheet and shaped. The leaves measure approximately 30mm X 17mm to the widest points and the earrings drops approximately 76mm from the ear.
Long leaf earrings £36
Long leaf earrings £36
Long leaf earrings £36
Show More
Long leaf earrings £36

These long leaf print earrings are made with sterling silver. To achieve the leaf texture a skeleton leaf is pressed into silver sheet and shaped. The leaves measure approximately 30mm X 17mm to the widest points and the earrings drops approximately 76mm from the ear.